Friday 30 January 2015

We found geological cracks at bottom during Head Race Tunnel excavation in Dikchu- 96 MW, Hydro Electric Project in Sikkim, India. Expert team has decided to apply treatment by trench cutting followed by RCC application. Further we appreciate your helpful suggestions to over come such phenomenon in future for safe and successful construction practices.

Wednesday 1 October 2014

D-SHAPE TUNNEL CROSS-SECTION AREA CALCULATION TECHNIQUE

As presented earlier, the short-cut technique for Area calculation of tunnels cross-section, the calculation for Area of D-Shape tunnels has been specified this time.
For calculating the cross-sectional area, most of the time we depend on Auto Cad, as well as various hectic calculations.
From my past experiences and as per knowledge, the short-cut calculation has been developed, called as AREA CBS FACTOR, the calculation has been shown below……..

C/S AREA OF D-SHAPE TUNNEL =  d2 X CBS FACTOR


Where,
d = Dia. Of D-Shape tunnel
CBS FACTOR = 0.8927

From above formula, we can calculate Area instantly with simple multiplication.

For example….
For a 6mt. dia tunnel, the Area has been calculated…
Area = d2 X 0.8927
   62 x 0.8927  ->   32.13 m2
The above calculation can be verified using Auto-Cad or any mathematical technique











area   32.1372 m2
         perimeter   21.4248 m

Monday 15 September 2014

Thursday 11 September 2014


For calculating the cross-sectional area, most of the time we depend on Auto Cad, as well as various hectic calculations.

From my past experiences and as per knowledge, the short-cut calculation has been developed, called as AREA CBS FACTOR, the calculation has been shown below……..


C/S AREA OF HORSE SHOE SHAPE TUNNEL =  d2 X CBS FACTOR


Where,

d = Dia. Of horse shoe shape tunnel

CBS FACTOR = 0.829323611


From above formula, we can calculate Area instantly with simple multiplication.


For example….

For a 6mt. dia tunnel, the Area has been calculated…

Area = d2 x 0.829323611

             62 x 0.829323611 ->   29.85 m2

The above calculation can be verified using Auto-Cad or any mathematical technique